counter

Holmes on Homes

2003

Stone Walled 6 Season 4 Episode

7.6

Lisa and Joe decided to have an existing wooden retaining wall in their backyard rebuilt using concrete blocks. As the new block wall went up, Joe and Lisa began to question some glaring items - the lack of gravel base and the Geo-grid reinforcement material lay unused even though most of the wall was up. The project dragged on and the wall simply wasn't getting finished. Finally, the contractor stopped coming altogether and would not answer his cell phone. Lisa actually phoned the local hospitals to check if he had been admitted. They couldn't believe he would just disappear without finishing the job and leaving behind his tools. The homeowners had paid the contractor for all the materials, and when they received a bill in the mail a month later from the material supplier for the remaining 50% balance, they realized they had been taken for a ride. Mike and his team of landscape professions tear down the wall and build a retaining wall that is rock solid.

Released
24 Mar, 2003
0 comments
Log in to comment !

No comments yet!

Recommended For You

Off Campus
2026

Off Campus

Drama TV Show
The Neighborhood
2018

The Neighborhood

Comedy TV Show
Chicago Fire
2012

Chicago Fire

Drama TV Show
S.W.A.T.
2017

S.W.A.T.

Crime TV Show
Two and a Half Men
2003

Two and a Half Men

Comedy TV Show
Fallout
2024

Fallout

Drama TV Show
Lab Rats
2012

Lab Rats

Comedy TV Show
All American
2018

All American

Drama TV Show
The Simpsons
1989

The Simpsons

Family TV Show
Stranger Things
2016

Stranger Things

Drama TV Show
Henry Danger
2014

Henry Danger

Comedy TV Show
American Horror Story
2011

American Horror Story

Drama TV Show
Power Book II: Ghost
2020

Power Book II: Ghost

Crime TV Show
Tulsa King
2022

Tulsa King

Crime TV Show
Adventure Time
2010

Adventure Time

Animation TV Show
Breaking Bad
2008

Breaking Bad

Drama TV Show
Join the Jilo Viral community